🍐 我们总结了美国代写中——政治代写的经典案例,如果你有任何assignment代写的需要,可以随时联络我们。CoursePear™ From @2009。(CYB104)

Instruction
 Layout:
o Font: Calibri 11 (for Part 1)
o Page Length: 4 pages – includes all parts (see caveat below) o Spacing: Single Space within paragraphs
o New Paragraphs: Double Space
o Include a title page for: Assignment #, Name, and Date, etc.
(does not count for page length)
o Sources cited do not count for page length requirements (put on a
separate page)
 PART 1
o Read the GFOA Best Practices: Multi-Year Capital
Planning and Capital Budget Presentation, along with Bartle Ch. 11 and Bland Ch. 11
o Examine the City of Hoover, Alabama 5-Year Capital Improvement Plan Form
 Five Year Capital Improvement Request Form fy 2022.doc (Attached)
 Discuss how the form fits within the context of your readings on capital planning and budgeting (specifically, discuss at least 2
of the form highlighted in pink/purple, as applicable)
 Last, discuss how you would improve the form based on your readings
 This be 1 page or less
major
sections
should
o Use and cite assigned reading materials
 PART 2 – Develop Your City:
o From Assignment 3, Part 2 B, you needed $5 million of equipment
 Assume the equipment is $5 million worth of dump trucks ($1 million for each truck) in year 1
 Assume you will need to hire 5 employees, whose salaries and benefits per employee is $100,000 each – 1 employee per truck
 Assume the same equipment and additional personnel is needed in years 3 and years 5
 Do not calculate a CPI for this assignment; Stay with the numbers above
o With the above assumptions, complete a Five-Year Capital Improvement Request Form
 This will be 3 pages – all pages of the one form


CoursePear™是一家服务全球留学生的专业代写
—-我们专注提供高质靠谱的美国、加拿大、英国、澳洲、新西兰代写服务。
—-我们专注提供Essay、统计、金融、CS、经济、数学等覆盖100+专业的作业代写服务。

essay代写

CoursePear™提供各类学术服务,Essay代写Assignment代写Exam / Quiz助攻Dissertation / Thesis代写Problem Set代做等。